Switchboard arc flash protection and PD monitoring: sample DWG

The arc flash protection and partial discharge monitoring of an 11 kV switchboard. Four panels, an incomer, two feeders and a bus section, each have a busbar, a breaker and a cable compartment with its own zone mark and light sensor. The twelve sensor fibres are grouped into four channels on the arc flash relay. The relay trips the incomer and the bus section only when the current check from the incomer sees an overcurrent, and a mark shows the light-only mode used for tests. Below the panels one earth voltage sensor per panel feeds a partial discharge host, which reports through a gateway to SCADA. A legend, system data and notes complete the sheet with a filled-in title block, on the same template as our process drawings.

Free to use and modify in your own projects, including commercial ones. The ZIP holds the sample drawing, a template, a plot style table and a README; no add-in needed. The data in the drawing is made up, so it is not for design or construction. Provided as is, without warranty. Library terms (CXL-1.0)

This sample uses these resources

The symbols are blocks from our own libraries, with their attributes filled in. The sheet and its title block come from our ISO A3 title block template. Download them to draw your own diagrams.

What is in the ZIP

  • Switchboard-Arc-Flash-Monitoring-Sample.dwg
    Sample drawing (DWG, AutoCAD 2018 format)
  • Process-Template-ISO-A3.dwt
    Template (DWT) that the drawing was made on
  • CADXChange-Monochrome.ctb
    Plot style table (CTB) that prints every colour black
  • README.txt
    README with the layer list and how to use the files

The template

The process template has 14 layers with colours, line weights and linetypes (main, secondary and utility lines, electrical and pneumatic signals, equipment, boundaries, flow arrows, tags, line numbers, text and more), the text styles ISO-2.5 to ISO-5, the dimension style ISO-25 and an ISO A3 layout with a title block and revision table. The layer names are a common convention, not a standard; rename them to match your company's rules.

Layers defined

Every layer in the template with its colour, line weight and linetype, and how many objects of this sample are on it. Layers the sample does not use are still defined, ready for your own drawing.

LayerColourLine weightLinetypeUsed forObjects here
Process layers
PROC-PIPE-MAIN50.50 mmContinuousMain process lines3
PROC-PIPE-SEC40.35 mmContinuousSecondary and branch process lines51
PROC-PIPE-UTIL300.35 mmContinuousUtility lines (steam, condensate, cooling water, air)not used here
PROC-SIGNAL30.18 mmDASHEDElectrical signal lines14
PROC-PNEU60.18 mmDASHDOTPneumatic and capillary signal linesnot used here
SYMBOL70.25 mmContinuousSymbols (the layer the symbol libraries use)35
PROC-EQUIP70.35 mmContinuousEquipment outlines drawn outside the symbol libraries24
PROC-BOUNDARY10.18 mmDASHDOTPackage, skid and battery limitsnot used here
PROC-FLOW70.18 mmContinuousFlow arrows and flow direction marks1
PROC-TAG70.18 mmContinuousEquipment and instrument tagsnot used here
PROC-LINE-NO70.18 mmContinuousLine numbers and line specificationsnot used here
PROC-TEXT70.18 mmContinuousGeneral text40
PROC-NOTES70.18 mmContinuousNotes and legends12
PROC-DIM30.18 mmContinuousDimensionsnot used here
Sheet and symbol layers
07defaultContinuousDefault layer, keep it emptynot used here
FRAME7defaultContinuousSheet border5
TITLEBLOCK7defaultContinuousTitle block and revision table1
VIEWPORT8defaultContinuousLayout viewport frame (does not plot)2
DRAWING-AREA8defaultContinuousBoundary of the model drawing area (does not plot)2

Styles defined

The text styles, the dimension style and the linetypes that the template defines, so you do not have to set them up in each new drawing.

KindNameSettings
Text styleISOisocp.shx, 15°, variable height
Text styleISO-2.5isocp.shx, 15°, 2.5 mm high
Text styleISO-3.5isocp.shx, 15°, 3.5 mm high
Text styleISO-5isocp.shx, 15°, 5 mm high
Text styleTB-enArial, used by the title block
Dimension styleISO-25Text 2.5 mm, arrows 2.5 mm, extension lines 1.25 mm beyond the dimension line and 0.625 mm from the object, dimension lines 3.75 mm apart, 0 decimals
LinetypeContinuousSolid line
LinetypeDASHEDDashed
LinetypeDASHDOTDash-dot
LinetypeCENTERCentre line
LinetypePHANTOMPhantom line
LinetypeHIDDENHidden line

Sheet and drawing setup

How the sheet is set up, so your own drawings print the same way.

Sheet
ISO A3 landscape, 420 × 297 mm.
Layout
One layout named ISO-A3, plotted at 1:1 on full-bleed A3 media, so the sheet has no printer margin.
Border
20 mm from the left edge (binding side) and 10 mm from the other edges; the drawing area inside is 390 × 277 mm.
Model space
Units are millimetres. The drawing area is shown at 1:1, so 1 mm in the drawing is 1 mm on paper.
Title block
160 × 79 mm at the lower right, with a four-line revision table above the company, project, title and approval fields.
Text size
2.5 mm for labels and notes, 3.5 mm and 5 mm for headings.
Linetype scale
1, so dashes are sized for plotting at 1:1.
Plot style
None set. Pick the CTB from the ZIP in the page setup for black-and-white plots.

Title block fields

The attributes of the title block.

AttributeField on the sheetValue in this sample
COMPANYCOMPANYCADXChange
PROJECTPROJECT11 kV Switchboard S1
AREAAREASwitch room
SYSTEMSYSTEMCondition monitoring
CLIENTCLIENTSample
TITLEDRAWING TITLESwitchboard arc flash and PD monitoring
DRAWING_NODRAWING NO.M-502
CONTRACT_NOCONTRACT NO.—
REVREVA
DRAWNDRAWN—
CHECKEDCHECKED—
APPROVEDAPPROVED—
DATEDATE2026-11-25
SCALESCALENTS
SHEETSHEET1
SHEET_OFOF1

Revision table: R1 to R4, each with REV, DATE, DESCRIPTION and BY (16 attributes, empty in this sample).

Blocks in the drawing

The equipment list of the drawing: block name, symbol and how many times it is placed.

SymbolBlockPlaced
Arc point sensorPMN_ARC_POINT12
Busbar compartment zonePMN_ARC_ZONE_BUS4
Breaker compartment zonePMN_ARC_ZONE_CB4
Cable compartment zonePMN_ARC_ZONE_CABLE4
Partial discharge, TEVPMN_SG_PD_TEV4
Trip outputPMN_ARC_TRIP_OUT2
Arc flash relayPMN_ARC_RELAY1
Current check inputPMN_ARC_CT_INPUT1
Light-only mode markPMN_ARC_LIGHT_ONLY1
Partial discharge hostPMN_SG_PD_HOST1
Edge gatewayPMN_SYS_EDGE_GW1

Equipment schedule

One row per placed symbol, read from the attributes of the blocks in the drawing: what is shown on the sheet, and the schedule attributes that were filled in but are not shown.

TagDescriptionShown on the sheetFilled in, not shown
BB-1Busbar compartment zonePMN_ARC_ZONE_BUSZONE = Busbar compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-1Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 1
CB-1Breaker compartment zonePMN_ARC_ZONE_CBZONE = Breaker compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-2Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 2
CC-1Cable compartment zonePMN_ARC_ZONE_CABLEZONE = Cable compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-3Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 3
BB-2Busbar compartment zonePMN_ARC_ZONE_BUSZONE = Busbar compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-4Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 4
CB-2Breaker compartment zonePMN_ARC_ZONE_CBZONE = Breaker compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-5Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 5
CC-2Cable compartment zonePMN_ARC_ZONE_CABLEZONE = Cable compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-6Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 6
BB-3Busbar compartment zonePMN_ARC_ZONE_BUSZONE = Busbar compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-7Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 7
CB-3Breaker compartment zonePMN_ARC_ZONE_CBZONE = Breaker compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-8Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 8
CC-3Cable compartment zonePMN_ARC_ZONE_CABLEZONE = Cable compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-9Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 9
BB-4Busbar compartment zonePMN_ARC_ZONE_BUSZONE = Busbar compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-10Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 10
CB-4Breaker compartment zonePMN_ARC_ZONE_CBZONE = Breaker compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-11Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 11
CC-4Cable compartment zonePMN_ARC_ZONE_CABLEZONE = Cable compartmentLENGTH_M = -ALARM_C = -CHANNEL = -LOCATION = 11 kV switchboard S1
AS-12Arc point sensorPMN_ARC_POINTSENSITIVITY_LUX = 8000TRIP_TIME_MS = 2COMPARTMENT = Panel compartmentOUTPUT = Fibre opticCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 12
AFR-1Arc flash relayPMN_ARC_RELAYSENSITIVITY_LUX = -TRIP_TIME_MS = 7COMPARTMENT = All panelsOUTPUT = 2 trip, 1 alarmCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 13
CI-1Current check inputPMN_ARC_CT_INPUTSENSITIVITY_LUX = -TRIP_TIME_MS = -COMPARTMENT = IncomerOUTPUT = Current checkCURRENT_CHECK = 2.5 x InLOCATION = 11 kV switchboard S1ADDRESS = 14
TO-1Trip outputPMN_ARC_TRIP_OUTSENSITIVITY_LUX = -TRIP_TIME_MS = 3COMPARTMENT = Q1 and Q3OUTPUT = Trip coil, 110 V DCCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 15
TO-2Trip outputPMN_ARC_TRIP_OUTSENSITIVITY_LUX = -TRIP_TIME_MS = 3COMPARTMENT = Q1 and Q3OUTPUT = Trip coil, 110 V DCCURRENT_CHECK = YesLOCATION = 11 kV switchboard S1ADDRESS = 16
LO-1Light-only mode markPMN_ARC_LIGHT_ONLYSENSITIVITY_LUX = -TRIP_TIME_MS = -COMPARTMENT = All panelsOUTPUT = Alarm onlyCURRENT_CHECK = NoLOCATION = 11 kV switchboard S1ADDRESS = 17
PDT-1Partial discharge, TEVPMN_SG_PD_TEVMETHOD = TEVFREQUENCY_BAND = 3-100 MHzSENSITIVITY_PC = 50CHANNELS = 1OUTPUT = CoaxialLOCATION = 11 kV switchboard S1ADDRESS = 18
PDT-2Partial discharge, TEVPMN_SG_PD_TEVMETHOD = TEVFREQUENCY_BAND = 3-100 MHzSENSITIVITY_PC = 50CHANNELS = 1OUTPUT = CoaxialLOCATION = 11 kV switchboard S1ADDRESS = 19
PDT-3Partial discharge, TEVPMN_SG_PD_TEVMETHOD = TEVFREQUENCY_BAND = 3-100 MHzSENSITIVITY_PC = 50CHANNELS = 1OUTPUT = CoaxialLOCATION = 11 kV switchboard S1ADDRESS = 20
PDT-4Partial discharge, TEVPMN_SG_PD_TEVMETHOD = TEVFREQUENCY_BAND = 3-100 MHzSENSITIVITY_PC = 50CHANNELS = 1OUTPUT = CoaxialLOCATION = 11 kV switchboard S1ADDRESS = 21
PDH-1Partial discharge hostPMN_SG_PD_HOSTCHANNELS = 8SUPPLY_V = 24 V DCCOMMUNICATION = EthernetOUTPUTS = 2MOUNTING = WallLOCATION = 11 kV switchboard S1ADDRESS = 22
EG-1Edge gatewayPMN_SYS_EDGE_GWFUNCTION = Gateway to SCADAPORTS = 4SUPPLY_V = 24 V DCPROTOCOL = IEC 60870-5-104MOUNTING = RackLOCATION = 11 kV switchboard S1ADDRESS = 23

Manufacturer, model and remarks are left empty on every block, ready for your data. The values are examples.

How to use it

  1. Open the sample drawing to see how layers, text and the title block are used, or open it in the browser first, nothing to install.
  2. Start your own drawing from the template (NEW, then pick the DWT file). Copy the CTB file to your plot styles folder if you want black-and-white plots.
  3. Insert blocks from the symbol library into your drawing. The blocks in the sample are copies; they do not change when a library changes.

Frequently asked questions

Can I use the drawing for a real project?
As a starting point for layout and layers, yes. The ratings, settings and cable sizes are made up, so the diagram has to be checked and changed for your project before it is used for design or construction.
Why are the layers coloured?
Colours and line weights follow the layers: power circuits are red and heavy, control is cyan, signal is green. The plot style table in the ZIP prints everything black and keeps the line weights, so you can plot in black and white as well.
Which CAD programs open it?
The drawing and the template are in AutoCAD 2018 format, which AutoCAD 2018 and later open, and so do other CAD programs that read this format. The browser viewer needs nothing installed.