CADXChange

ResourcesISO 14617: Graphical symbols for diagrams

Sleeve through construction symbol (DWG block)

Sleeve through construction is a ready-to-use AutoCAD block named ISX_3001_SLEEVE_THROUGH_CONSTRUCTION in the ISO 14617: Graphical symbols for diagrams, group “Installation of pipelines and ducts: basic symbols”. It carries 10 attributes, 1 of them visible, so it works in equipment lists and BlockSync exports.

Sleeve through construction symbol, block ISX_3001_SLEEVE_THROUGH_CONSTRUCTION

Block details

Block nameISX_3001_SLEEVE_THROUGH_CONSTRUCTION
LibraryISO 14617: Graphical symbols for diagrams
GroupInstallation of pipelines and ducts: basic symbols
StandardISO 14617
Attributes10 attributes, 1 visible

Attributes

Visible on the drawing: TAG.

Hidden, they carry the data for schedules: SERVICE, LOCATION, CAPACITY, MANUFACTURER, MODEL, REMARKS, STD_CLAUSE, STD_REF, DESC.

Export the attributes of every copy in a drawing to Excel with BlockSync, check them and write the corrections back in one run.

How to use it

  1. Download the ZIP and unzip it. It holds one DWG with the block ISX_3001_SLEEVE_THROUGH_CONSTRUCTION.
  2. Open the DWG and copy the block into your drawing, or insert it from the DWG with INSERT.
  3. Double-click a copy to fill in the tag and the other attributes.

The symbol is our own drawing after the common form of ISO 14617, not a certified copy. The library page explains how the symbols relate to the standard.

Names in other languages

The same symbol under its name in the other site languages.

English
Sleeve through construction
Simplified Chinese
穿墙套管
Traditional Chinese
穿牆套管
Japanese
構造貫通スリーブ
Korean
구조물 관통 슬리브
German
Hülse durch Bauteil
French
Fourreau traversant la construction
Italian
Manicotto attraverso la struttura
Spanish
Manguito a través de la construcción

More symbols in the group “Installation of pipelines and ducts: basic symbols”