CADXChange

ResourcesDWG symbol libraries

Free swimming pool, spa and outdoor living blocks for AutoCAD (DWG): pools, loungers, outdoor kitchens

Swimming pool, spa and outdoor living symbols: 180 ready-made AutoCAD blocks (DWG), free to download and use in your own projects, as a ZIP or one symbol at a time.

180 plan blocks for pool, terrace and garden design at real size in millimetres: swimming pools (rectangular in four sizes, with steps, sun shelf, Roman end, Grecian or rounded corners, L-shaped, kidney, free form, round, oval, lap, diving, infinity edge, plunge, wading, swim spa, above-ground, koi pond, reflecting pool and fountain basin); spas, hot tubs, cold plunge and saunas; pool edge and equipment such as steps, ladder, handrail, skimmer, jets, drain, light, pump, sand and cartridge filters, heater, heat pump, chlorinator, balance tank, plant room, cover reel, diving board, slide, lane rope, waterfall and shower; loungers, daybeds, cabanas, gazebos, pergolas, louvred roofs, shade sails and parasols; outdoor dining and lounge sets, bar, hammock, swing seat and benches; outdoor kitchens with grills, sinks, fridges and pizza oven, fire pits, fire tables and a fireplace; decks, paving, steps, ramps and retaining walls; fences, glass pool fences, gates, hedges and boundary lines; garden lights, sprinklers, drains and taps; ten ready-made pool and terrace layouts; and pool tag, level mark, zone tag, safety zone, depth mark, north arrow and section mark.

Using AutoCAD 2017 or an earlier version? Download the 2010 format

Free to use and modify in your own projects, including commercial ones. The ZIP holds one plain DWG file in AutoCAD 2018 format and a README; no add-in needed. Provided as is, without warranty.

All 180 symbols

180 of 180 symbols

  • Preview of the Pool, rectangular 6 x 3 m symbol, block POL_POOL_6X3

    Pool, rectangular 6 x 3 m

    POL_POOL_6X3

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, rectangular 8 x 4 m symbol, block POL_POOL_8X4

    Pool, rectangular 8 x 4 m

    POL_POOL_8X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, rectangular 10 x 5 m symbol, block POL_POOL_10X5

    Pool, rectangular 10 x 5 m

    POL_POOL_10X5

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, rectangular 12 x 6 m symbol, block POL_POOL_12X6

    Pool, rectangular 12 x 6 m

    POL_POOL_12X6

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 8 x 4 m, full width steps symbol, block POL_POOL_8X4_STEPS

    Pool, 8 x 4 m, full width steps

    POL_POOL_8X4_STEPS

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 9 x 4 m, sun shelf symbol, block POL_POOL_9X4_LEDGE

    Pool, 9 x 4 m, sun shelf

    POL_POOL_9X4_LEDGE

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 10 x 4 m, Roman end symbol, block POL_POOL_10X4_ROMAN

    Pool, 10 x 4 m, Roman end

    POL_POOL_10X4_ROMAN

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 9 x 4.5 m, Grecian corners symbol, block POL_POOL_9X4_GRECIAN

    Pool, 9 x 4.5 m, Grecian corners

    POL_POOL_9X4_GRECIAN

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 8 x 4 m, rounded corners symbol, block POL_POOL_ROUNDED_8X4

    Pool, 8 x 4 m, rounded corners

    POL_POOL_ROUNDED_8X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, L-shaped 8 x 5 m symbol, block POL_POOL_L_8X5

    Pool, L-shaped 8 x 5 m

    POL_POOL_L_8X5

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, kidney 8 x 4 m symbol, block POL_POOL_KIDNEY_8X4

    Pool, kidney 8 x 4 m

    POL_POOL_KIDNEY_8X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, free form 9 x 5 m symbol, block POL_POOL_FREE_9X5

    Pool, free form 9 x 5 m

    POL_POOL_FREE_9X5

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, free form 7 x 4 m symbol, block POL_POOL_FREE_7X4

    Pool, free form 7 x 4 m

    POL_POOL_FREE_7X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, round 5 m symbol, block POL_POOL_ROUND_5

    Pool, round 5 m

    POL_POOL_ROUND_5

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, oval 8 x 4.5 m symbol, block POL_POOL_OVAL_8X4

    Pool, oval 8 x 4.5 m

    POL_POOL_OVAL_8X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Lap pool, 15 x 2.5 m symbol, block POL_POOL_LAP_15X2

    Lap pool, 15 x 2.5 m

    POL_POOL_LAP_15X2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Lap pool, 12 x 3 m, two lanes symbol, block POL_POOL_LAP_12X3

    Lap pool, 12 x 3 m, two lanes

    POL_POOL_LAP_12X3

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, 12 x 7 m, deep end and board symbol, block POL_POOL_DIVE_12X7

    Pool, 12 x 7 m, deep end and board

    POL_POOL_DIVE_12X7

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool, infinity edge 9 x 4 m symbol, block POL_POOL_INFINITY_9X4

    Pool, infinity edge 9 x 4 m

    POL_POOL_INFINITY_9X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Plunge pool, 3 x 2 m symbol, block POL_POOL_PLUNGE_3X2

    Plunge pool, 3 x 2 m

    POL_POOL_PLUNGE_3X2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Plunge pool, round 2.5 m symbol, block POL_POOL_PLUNGE_R25

    Plunge pool, round 2.5 m

    POL_POOL_PLUNGE_R25

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Wading pool, 4 x 3 m symbol, block POL_POOL_WADING_4X3

    Wading pool, 4 x 3 m

    POL_POOL_WADING_4X3

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Swim spa, 5 x 2.3 m symbol, block POL_POOL_SWIMSPA_5X2

    Swim spa, 5 x 2.3 m

    POL_POOL_SWIMSPA_5X2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Above-ground pool, round 4.5 m symbol, block POL_POOL_ABOVE_R45

    Above-ground pool, round 4.5 m

    POL_POOL_ABOVE_R45

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Above-ground pool, oval 6 x 3.6 m symbol, block POL_POOL_ABOVE_6X3

    Above-ground pool, oval 6 x 3.6 m

    POL_POOL_ABOVE_6X3

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden pond, koi 4 x 2.5 m symbol, block POL_POND_KOI_4X2

    Garden pond, koi 4 x 2.5 m

    POL_POND_KOI_4X2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Reflecting pool, 6 x 2 m symbol, block POL_POND_REFLECT_6X2

    Reflecting pool, 6 x 2 m

    POL_POND_REFLECT_6X2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fountain basin, round 2 m symbol, block POL_FOUNTAIN_R2

    Fountain basin, round 2 m

    POL_FOUNTAIN_R2

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, round 2 m symbol, block POL_SPA_ROUND_2000

    Spa, round 2 m

    POL_SPA_ROUND_2000

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, square 2.1 m, corner seats symbol, block POL_SPA_SQUARE_2100

    Spa, square 2.1 m, corner seats

    POL_SPA_SQUARE_2100

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, rectangular 2.4 x 2 m, bench seats symbol, block POL_SPA_RECT_2400

    Spa, rectangular 2.4 x 2 m, bench seats

    POL_SPA_RECT_2400

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, oval 2.3 x 1.8 m symbol, block POL_SPA_OVAL_2300

    Spa, oval 2.3 x 1.8 m

    POL_SPA_OVAL_2300

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, corner 2 m symbol, block POL_SPA_CORNER_2000

    Spa, corner 2 m

    POL_SPA_CORNER_2000

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, lounger seat 2.3 x 2.1 m symbol, block POL_SPA_LOUNGE_2300

    Spa, lounger seat 2.3 x 2.1 m

    POL_SPA_LOUNGE_2300

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa, raised with spillway, 2 m symbol, block POL_SPA_SPILLOVER

    Spa, raised with spillway, 2 m

    POL_SPA_SPILLOVER

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Hot tub, wooden barrel 1.8 m symbol, block POL_HOTTUB_BARREL

    Hot tub, wooden barrel 1.8 m

    POL_HOTTUB_BARREL

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Cold plunge tub, round 1 m symbol, block POL_COLD_PLUNGE_R10

    Cold plunge tub, round 1 m

    POL_COLD_PLUNGE_R10

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sauna, barrel 3 x 2.1 m symbol, block POL_SAUNA_BARREL

    Sauna, barrel 3 x 2.1 m

    POL_SAUNA_BARREL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sauna cabin, 2 x 2 m symbol, block POL_SAUNA_2X2

    Sauna cabin, 2 x 2 m

    POL_SAUNA_2X2

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool steps, corner 1.5 m symbol, block POL_STEPS_CORNER

    Pool steps, corner 1.5 m

    POL_STEPS_CORNER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool steps, Roman 3 m symbol, block POL_STEPS_ROMAN

    Pool steps, Roman 3 m

    POL_STEPS_ROMAN

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool steps, full width 3 m symbol, block POL_STEPS_FULL

    Pool steps, full width 3 m

    POL_STEPS_FULL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool bench ledge 3 m symbol, block POL_STEPS_BENCH

    Pool bench ledge 3 m

    POL_STEPS_BENCH

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool ladder symbol, block POL_LADDER

    Pool ladder

    POL_LADDER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool handrail 1.5 m symbol, block POL_HANDRAIL

    Pool handrail 1.5 m

    POL_HANDRAIL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Skimmer symbol, block POL_SKIMMER

    Skimmer

    POL_SKIMMER

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Return jet symbol, block POL_RETURN_JET

    Return jet

    POL_RETURN_JET

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Main drain symbol, block POL_MAIN_DRAIN

    Main drain

    POL_MAIN_DRAIN

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool light symbol, block POL_POOL_LIGHT

    Pool light

    POL_POOL_LIGHT

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool pump 600 x 400 symbol, block POL_PUMP

    Pool pump 600 x 400

    POL_PUMP

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sand filter, 750 symbol, block POL_FILTER_SAND

    Sand filter, 750

    POL_FILTER_SAND

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Cartridge filter 500 x 1000 symbol, block POL_FILTER_CARTRIDGE

    Cartridge filter 500 x 1000

    POL_FILTER_CARTRIDGE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool heater 600 x 400 symbol, block POL_HEATER

    Pool heater 600 x 400

    POL_HEATER

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Heat pump 1000 x 400 symbol, block POL_HEAT_PUMP

    Heat pump 1000 x 400

    POL_HEAT_PUMP

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Chlorinator, salt cell symbol, block POL_CHLORINATOR

    Chlorinator, salt cell

    POL_CHLORINATOR

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the UV disinfection unit symbol, block POL_UV_UNIT

    UV disinfection unit

    POL_UV_UNIT

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Balance tank 1500 x 1000 symbol, block POL_BALANCE_TANK

    Balance tank 1500 x 1000

    POL_BALANCE_TANK

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool plant room 3 x 2.5 m symbol, block POL_PLANT_ROOM

    Pool plant room 3 x 2.5 m

    POL_PLANT_ROOM

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool cover reel 4.5 m symbol, block POL_COVER_REEL

    Pool cover reel 4.5 m

    POL_COVER_REEL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Diving board 3 m symbol, block POL_DIVING_BOARD

    Diving board 3 m

    POL_DIVING_BOARD

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Starting block symbol, block POL_STARTING_BLOCK

    Starting block

    POL_STARTING_BLOCK

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool slide, S-curve 4 m symbol, block POL_SLIDE_S

    Pool slide, S-curve 4 m

    POL_SLIDE_S

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Lane rope 10 m symbol, block POL_LANE_ROPE

    Lane rope 10 m

    POL_LANE_ROPE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool waterfall wall 1.5 m symbol, block POL_WATERFALL

    Pool waterfall wall 1.5 m

    POL_WATERFALL

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Overflow channel 3 m symbol, block POL_OVERFLOW_CHANNEL

    Overflow channel 3 m

    POL_OVERFLOW_CHANNEL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool shower, pole symbol, block POL_SHOWER_POLE

    Pool shower, pole

    POL_SHOWER_POLE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Foot wash tray symbol, block POL_FOOT_WASH

    Foot wash tray

    POL_FOOT_WASH

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sun lounger 600 x 1900 symbol, block POL_LOUNGER

    Sun lounger 600 x 1900

    POL_LOUNGER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sun lounger, back raised symbol, block POL_LOUNGER_ADJ

    Sun lounger, back raised

    POL_LOUNGER_ADJ

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sun lounger, double 1300 x 1950 symbol, block POL_LOUNGER_DOUBLE

    Sun lounger, double 1300 x 1950

    POL_LOUNGER_DOUBLE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Daybed 2000 x 1400 symbol, block POL_DAYBED_2000

    Daybed 2000 x 1400

    POL_DAYBED_2000

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Daybed, round 2 m with canopy symbol, block POL_DAYBED_R2000

    Daybed, round 2 m with canopy

    POL_DAYBED_R2000

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Cabana 3 x 3 m symbol, block POL_CABANA_3X3

    Cabana 3 x 3 m

    POL_CABANA_3X3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Cabana 4 x 4 m symbol, block POL_CABANA_4X4

    Cabana 4 x 4 m

    POL_CABANA_4X4

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Gazebo, square 3 m symbol, block POL_GAZEBO_SQ_3

    Gazebo, square 3 m

    POL_GAZEBO_SQ_3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Gazebo, octagonal 3.5 m symbol, block POL_GAZEBO_OCT_35

    Gazebo, octagonal 3.5 m

    POL_GAZEBO_OCT_35

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pergola 3 x 3 m symbol, block POL_PERGOLA_3X3

    Pergola 3 x 3 m

    POL_PERGOLA_3X3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pergola 5 x 3 m symbol, block POL_PERGOLA_5X3

    Pergola 5 x 3 m

    POL_PERGOLA_5X3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Louvred roof 4 x 3 m symbol, block POL_PERGOLA_LOUVRE

    Louvred roof 4 x 3 m

    POL_PERGOLA_LOUVRE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Shade sail, triangle 4 m symbol, block POL_SHADE_SAIL_TRI

    Shade sail, triangle 4 m

    POL_SHADE_SAIL_TRI

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Shade sail, rectangular 3 x 4 m symbol, block POL_SHADE_SAIL_RECT

    Shade sail, rectangular 3 x 4 m

    POL_SHADE_SAIL_RECT

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Parasol, round 2.5 m symbol, block POL_PARASOL_R25

    Parasol, round 2.5 m

    POL_PARASOL_R25

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Parasol, square 2.5 m symbol, block POL_PARASOL_SQ25

    Parasol, square 2.5 m

    POL_PARASOL_SQ25

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Cantilever umbrella 3 x 3 m symbol, block POL_UMBRELLA_CANTI

    Cantilever umbrella 3 x 3 m

    POL_UMBRELLA_CANTI

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Towel rack 1.2 m symbol, block POL_TOWEL_RACK

    Towel rack 1.2 m

    POL_TOWEL_RACK

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Dining table, 6 seats 1800 x 900 symbol, block POL_TABLE_6

    Dining table, 6 seats 1800 x 900

    POL_TABLE_6

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Dining table, 8 seats 2400 x 1000 symbol, block POL_TABLE_8

    Dining table, 8 seats 2400 x 1000

    POL_TABLE_8

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Dining table, round 1.2 m, 4 seats symbol, block POL_TABLE_R4

    Dining table, round 1.2 m, 4 seats

    POL_TABLE_R4

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Dining table, round 1.6 m, 6 seats symbol, block POL_TABLE_R6

    Dining table, round 1.6 m, 6 seats

    POL_TABLE_R6

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Bistro set, 2 seats symbol, block POL_BISTRO_2

    Bistro set, 2 seats

    POL_BISTRO_2

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Bar table with two stools symbol, block POL_BAR_TABLE_2

    Bar table with two stools

    POL_BAR_TABLE_2

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Bar counter 2400 with stools symbol, block POL_BAR_COUNTER

    Bar counter 2400 with stools

    POL_BAR_COUNTER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor sofa, 3 seats 2000 x 850 symbol, block POL_SOFA_3

    Outdoor sofa, 3 seats 2000 x 850

    POL_SOFA_3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor sofa, corner 2600 x 2600 symbol, block POL_SOFA_CORNER

    Outdoor sofa, corner 2600 x 2600

    POL_SOFA_CORNER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Lounge set, corner sofa and table symbol, block POL_LOUNGE_SET_L

    Lounge set, corner sofa and table

    POL_LOUNGE_SET_L

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor armchair 800 symbol, block POL_ARMCHAIR_800

    Outdoor armchair 800

    POL_ARMCHAIR_800

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Hanging egg chair 1 m symbol, block POL_SWING_EGG

    Hanging egg chair 1 m

    POL_SWING_EGG

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Hammock on stand 3.5 m symbol, block POL_HAMMOCK

    Hammock on stand 3.5 m

    POL_HAMMOCK

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Picnic table with benches symbol, block POL_PICNIC_TABLE

    Picnic table with benches

    POL_PICNIC_TABLE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden swing seat, 2 seats symbol, block POL_GARDEN_SWING

    Garden swing seat, 2 seats

    POL_GARDEN_SWING

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Ottoman 600 symbol, block POL_OTTOMAN_600

    Ottoman 600

    POL_OTTOMAN_600

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Side table, round 500 symbol, block POL_SIDE_TABLE_R50

    Side table, round 500

    POL_SIDE_TABLE_R50

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden bench, backed 1800 symbol, block POL_BENCH_1800

    Garden bench, backed 1800

    POL_BENCH_1800

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Built-in grill 900 x 600 symbol, block POL_GRILL_900

    Built-in grill 900 x 600

    POL_GRILL_900

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor kitchen run 3000 x 700 symbol, block POL_KITCHEN_3000

    Outdoor kitchen run 3000 x 700

    POL_KITCHEN_3000

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor kitchen, L-shaped 3000 x 2400 symbol, block POL_KITCHEN_L

    Outdoor kitchen, L-shaped 3000 x 2400

    POL_KITCHEN_L

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Kitchen island 2400 x 1200, bar seats symbol, block POL_KITCHEN_ISLAND

    Kitchen island 2400 x 1200, bar seats

    POL_KITCHEN_ISLAND

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Side burner 450 symbol, block POL_SIDE_BURNER

    Side burner 450

    POL_SIDE_BURNER

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor sink 900 x 600 symbol, block POL_OUTDOOR_SINK

    Outdoor sink 900 x 600

    POL_OUTDOOR_SINK

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor fridge 600 x 600 symbol, block POL_OUTDOOR_FRIDGE

    Outdoor fridge 600 x 600

    POL_OUTDOOR_FRIDGE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pizza oven 1000 x 1100 symbol, block POL_PIZZA_OVEN

    Pizza oven 1000 x 1100

    POL_PIZZA_OVEN

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Smoker, barrel 1200 x 600 symbol, block POL_SMOKER_1200

    Smoker, barrel 1200 x 600

    POL_SMOKER_1200

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fire pit, round 1 m symbol, block POL_FIRE_PIT_R1000

    Fire pit, round 1 m

    POL_FIRE_PIT_R1000

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fire pit, square 1 m symbol, block POL_FIRE_PIT_SQ

    Fire pit, square 1 m

    POL_FIRE_PIT_SQ

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fire pit seating circle 3.5 m symbol, block POL_FIRE_SEATING_R35

    Fire pit seating circle 3.5 m

    POL_FIRE_SEATING_R35

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fire table 1200 x 600 symbol, block POL_FIRE_TABLE

    Fire table 1200 x 600

    POL_FIRE_TABLE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor fireplace 1800 x 600 symbol, block POL_FIREPLACE_1800

    Outdoor fireplace 1800 x 600

    POL_FIREPLACE_1800

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Chimenea 800 symbol, block POL_CHIMENEA

    Chimenea 800

    POL_CHIMENEA

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Firewood store 1200 x 400 symbol, block POL_FIREWOOD_STORE

    Firewood store 1200 x 400

    POL_FIREWOOD_STORE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Timber deck 3 x 3 m symbol, block POL_DECK_3X3

    Timber deck 3 x 3 m

    POL_DECK_3X3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Timber deck 6 x 4 m symbol, block POL_DECK_4X6

    Timber deck 6 x 4 m

    POL_DECK_4X6

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Timber deck, diagonal boards 3 x 3 m symbol, block POL_DECK_DIAG

    Timber deck, diagonal boards 3 x 3 m

    POL_DECK_DIAG

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Paving, slabs 600 x 600, 3 x 3 m symbol, block POL_PAVING_3X3

    Paving, slabs 600 x 600, 3 x 3 m

    POL_PAVING_3X3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Paving, staggered 600 x 300 symbol, block POL_PAVING_STAGGER

    Paving, staggered 600 x 300

    POL_PAVING_STAGGER

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Paving, random stone 3 x 3 m symbol, block POL_PAVING_RANDOM

    Paving, random stone 3 x 3 m

    POL_PAVING_RANDOM

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Gravel area 3 x 3 m symbol, block POL_PAVING_GRAVEL

    Gravel area 3 x 3 m

    POL_PAVING_GRAVEL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Stepping stones, 5 pieces symbol, block POL_STEPPING_STONES

    Stepping stones, 5 pieces

    POL_STEPPING_STONES

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden path 1200 x 3000 symbol, block POL_PATH_1200

    Garden path 1200 x 3000

    POL_PATH_1200

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden steps, 5 treads 1200 symbol, block POL_STEPS_STRAIGHT

    Garden steps, 5 treads 1200

    POL_STEPS_STRAIGHT

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden steps, curved 1500 symbol, block POL_STEPS_CURVED

    Garden steps, curved 1500

    POL_STEPS_CURVED

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Ramp 1200 x 3000 symbol, block POL_RAMP_1200

    Ramp 1200 x 3000

    POL_RAMP_1200

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Retaining wall 3 m symbol, block POL_RETAIN_WALL

    Retaining wall 3 m

    POL_RETAIN_WALL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Raised planter 2000 x 600 symbol, block POL_PLANTER_RAISED

    Raised planter 2000 x 600

    POL_PLANTER_RAISED

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool surround, 1.5 m paving band 10 x 5 m symbol, block POL_POOL_SURROUND

    Pool surround, 1.5 m paving band 10 x 5 m

    POL_POOL_SURROUND

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Picket fence 3 m symbol, block POL_FENCE_PICKET

    Picket fence 3 m

    POL_FENCE_PICKET

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Closeboard fence 3 m symbol, block POL_FENCE_PANEL

    Closeboard fence 3 m

    POL_FENCE_PANEL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Glass pool fence 3 m symbol, block POL_FENCE_GLASS_POOL

    Glass pool fence 3 m

    POL_FENCE_GLASS_POOL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Mesh safety fence 3 m symbol, block POL_FENCE_MESH

    Mesh safety fence 3 m

    POL_FENCE_MESH

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Metal railing 3 m symbol, block POL_FENCE_RAIL

    Metal railing 3 m

    POL_FENCE_RAIL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden wall 3 m symbol, block POL_WALL_GARDEN

    Garden wall 3 m

    POL_WALL_GARDEN

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Hedge 3 m symbol, block POL_HEDGE

    Hedge 3 m

    POL_HEDGE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pedestrian gate 1000 symbol, block POL_GATE_PEDESTRIAN

    Pedestrian gate 1000

    POL_GATE_PEDESTRIAN

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Double gate 3000 symbol, block POL_GATE_DOUBLE_3

    Double gate 3000

    POL_GATE_DOUBLE_3

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sliding gate 4000 symbol, block POL_GATE_SLIDING_4

    Sliding gate 4000

    POL_GATE_SLIDING_4

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Self-closing pool gate 1000 symbol, block POL_GATE_POOL_SELF

    Self-closing pool gate 1000

    POL_GATE_POOL_SELF

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Bollard 200 symbol, block POL_BOLLARD

    Bollard 200

    POL_BOLLARD

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Property boundary 6 m symbol, block POL_BOUNDARY_LINE

    Property boundary 6 m

    POL_BOUNDARY_LINE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Setback line 6 m symbol, block POL_SETBACK_LINE

    Setback line 6 m

    POL_SETBACK_LINE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Bollard light symbol, block POL_LIGHT_BOLLARD

    Bollard light

    POL_LIGHT_BOLLARD

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden post light symbol, block POL_LIGHT_POST

    Garden post light

    POL_LIGHT_POST

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spike spotlight symbol, block POL_LIGHT_SPIKE

    Spike spotlight

    POL_LIGHT_SPIKE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Wall light symbol, block POL_LIGHT_WALL

    Wall light

    POL_LIGHT_WALL

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Festoon lights 6 m symbol, block POL_LIGHT_FESTOON

    Festoon lights 6 m

    POL_LIGHT_FESTOON

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Irrigation valve box symbol, block POL_IRRIGATION_VALVE

    Irrigation valve box

    POL_IRRIGATION_VALVE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pop-up sprinkler symbol, block POL_SPRINKLER_POP

    Pop-up sprinkler

    POL_SPRINKLER_POP

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Rotor sprinkler, 90 degree symbol, block POL_SPRINKLER_ROT

    Rotor sprinkler, 90 degree

    POL_SPRINKLER_ROT

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Garden tap symbol, block POL_HOSE_BIB

    Garden tap

    POL_HOSE_BIB

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Channel drain 3 m symbol, block POL_DRAIN_CHANNEL

    Channel drain 3 m

    POL_DRAIN_CHANNEL

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Drainage gully 300 symbol, block POL_GULLY

    Drainage gully 300

    POL_GULLY

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Soakaway 1200 symbol, block POL_SOAKAWAY

    Soakaway 1200

    POL_SOAKAWAY

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Water butt 600 symbol, block POL_WATER_BUTT

    Water butt 600

    POL_WATER_BUTT

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Borehole pump symbol, block POL_BORE_PUMP

    Borehole pump

    POL_BORE_PUMP

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Outdoor power socket symbol, block POL_EV_CHARGER

    Outdoor power socket

    POL_EV_CHARGER

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool 8 x 4 m with surround symbol, block POL_LAYOUT_POOL_8X4

    Pool 8 x 4 m with surround

    POL_LAYOUT_POOL_8X4

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool with four loungers symbol, block POL_LAYOUT_POOL_LOUNGE

    Pool with four loungers

    POL_LAYOUT_POOL_LOUNGE

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Terrace with dining set and parasol symbol, block POL_LAYOUT_TERRACE_DINE

    Terrace with dining set and parasol

    POL_LAYOUT_TERRACE_DINE

    Attributes

    DESIGNATIONSIZEMATERIALFINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Terrace with outdoor kitchen and table symbol, block POL_LAYOUT_TERRACE_KITCHEN

    Terrace with outdoor kitchen and table

    POL_LAYOUT_TERRACE_KITCHEN

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Spa on a timber deck 4 x 4 m symbol, block POL_LAYOUT_SPA_DECK

    Spa on a timber deck 4 x 4 m

    POL_LAYOUT_SPA_DECK

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Fire pit lounge 5 x 5 m symbol, block POL_LAYOUT_FIRE_LOUNGE

    Fire pit lounge 5 x 5 m

    POL_LAYOUT_FIRE_LOUNGE

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Sauna with cold plunge 5 x 3 m symbol, block POL_LAYOUT_PLUNGE_SAUNA

    Sauna with cold plunge 5 x 3 m

    POL_LAYOUT_PLUNGE_SAUNA

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Family pool 8 x 4 m, shade and loungers symbol, block POL_LAYOUT_FAMILY_POOL

    Family pool 8 x 4 m, shade and loungers

    POL_LAYOUT_FAMILY_POOL

    Attributes

    DESIGNATIONSIZEDEPTH_MMVOLUME_M3FINISHMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Patio with barbecue and bench symbol, block POL_LAYOUT_PATIO_BBQ

    Patio with barbecue and bench

    POL_LAYOUT_PATIO_BBQ

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Plant room and filter bed 4 x 3 m symbol, block POL_LAYOUT_PLANT_ROOM_BED

    Plant room and filter bed 4 x 3 m

    POL_LAYOUT_PLANT_ROOM_BED

    Attributes

    DESIGNATIONSIZEPOWER_KWFLOW_M3HSUPPLYMANUFACTURERMODELQTYREMARKSDESC

  • Preview of the Pool tag symbol, block POL_POOL_TAG

    Pool tag

    POL_POOL_TAG

    Attributes

    POOL_NOVOLUME_M3DEPTH_MMDESC

  • Preview of the Level mark symbol, block POL_LEVEL_MARK

    Level mark

    POL_LEVEL_MARK

    Attributes

    LEVELDATUMDESC

  • Preview of the Zone tag symbol, block POL_ZONE_TAG

    Zone tag

    POL_ZONE_TAG

    Attributes

    ZONEAREA_M2DESC

  • Preview of the Pool safety zone symbol, block POL_SAFETY_ZONE

    Pool safety zone

    POL_SAFETY_ZONE

    Attributes

    ZONE_NORULEDESC

  • Preview of the Depth mark symbol, block POL_DEPTH_MARK

    Depth mark

    POL_DEPTH_MARK

    Attributes

    DEPTH_MMDESC

  • Preview of the North arrow symbol, block POL_NORTH_ARROW

    North arrow

    POL_NORTH_ARROW

    Attributes

    ORIENTATIONDESC

  • Preview of the Section mark symbol, block POL_SECTION_MARK

    Section mark

    POL_SECTION_MARK

    Attributes

    SECTIONDESC

Missing a symbol? Tell us which one.

Attributes for parts lists

Every block has a visible description next to it (for example Pool, rectangular 8 x 4 m). The invisible attributes are SIZE, MATERIAL or FINISH, MANUFACTURER, MODEL, QTY and REMARKS; pools also carry DEPTH_MM and VOLUME_M3, and equipment carries POWER_KW, FLOW_M3H and SUPPLY. The markers carry their own visible text: POOL_NO with VOLUME_M3, LEVEL, ZONE with AREA_M2, ZONE_NO, DEPTH_MM and SECTION.

Export the blocks of a pool or garden plan to Excel with BlockSync to get a schedule of pools, equipment, furniture and paving with quantities and an electrical load for the plant, check it against the drawing and write corrections back in one run, with preview and backup.

How to use the library

  1. Unzip the file and open the DWG. Copy the symbols you need into your plan, or drag the blocks in from DesignCenter (ADCENTER).
  2. The blocks are drawn at real size, 1 drawing unit = 1 mm. Insert them at scale 1 on a plan drawn in millimetres; on a metre drawing scale them by 0.001. The catalog sheet shrinks every block to fit its cell, the blocks themselves stay at real size.
  3. The origin is the centre of each piece. Pools have the coping band outside and the water line inside, with ripple marks showing the water. Where a piece has a user side (loungers, grills, sofas) it faces -Y, so rotate the block to turn it. The ready-made layouts are groups of the single blocks: explode one to move its parts.
  4. Pool shapes are drawn as typical plan outlines, not as a design: the exact outline, depth profile and finish come from the pool designer. Steps, benches and sun shelves are separate blocks, so you can place them in any pool of your own drawing.

About the sizes

Pools, spas and garden furniture are not standardised, so the blocks use the sizes that builders and suppliers commonly list: pools 6 x 3 to 12 x 6 m, lap pools 2.5 or 3 m wide, spas about 2 to 2.4 m, loungers 600 x 1900 mm, dining tables for 6 or 8, pergolas 3 x 3 and 5 x 3 m. Check the sizes against your supplier's data sheets before you order.

The blocks are our own drawings, not copies of any catalogue, and the library is not certified. They are meant to plan the arrangement and count items, not to prove that a design meets pool safety, barrier, electrical, drainage or planning rules. Take fence heights, gate latches, setbacks, electrical zones around water and drainage from the rules that apply to your site.

Frequently asked questions

Which items are in the library?
Swimming pools, spas, hot tubs and saunas, pool edge and equipment, loungers and shade, outdoor dining and lounge, outdoor kitchen and fire, decks and paving, fences and gates, garden services and lighting, ten pool and terrace layouts and 7 markers. Trees and plants are in the landscape plan library, indoor-style furniture in the home library, walls, doors and windows in the architectural plan library.
Can I get a schedule of pool equipment from the drawing?
Yes. Pools carry DEPTH_MM and VOLUME_M3 and equipment carries POWER_KW, FLOW_M3H and SUPPLY as invisible attributes. Fill them in the attribute editor, export the blocks with BlockSync and add up the electrical load of the plant room. The sample values are placeholders, not manufacturer data.
Can I use the symbols in commercial projects?
Yes. They are free to use and modify in your own projects, including commercial ones. They are provided as is, without warranty.
Does it show that a pool design meets safety rules?
No. The blocks help you draw and count; they do not check anything. Barrier height, self-closing gates, depth marks, electrical zones around the water and drainage depend on your site and your local rules, so take them from the rules that apply.
Can I change a symbol or add attributes?
Yes. Open the DWG, edit a block with BEDIT to change it or add attributes, and save. To update drawings that already contain the block, run ATTSYNC or replace the block. Make a backup first: attribute values can be lost if ATTSYNC is used carelessly.
Where do I find a ready-made set of these symbols for AutoCAD?
AutoCAD itself ships only a small set of sample blocks, so a full symbol set has to come from a library. Download the ZIP on this page and open the DWG: every symbol is a block. Insert one with INSERT (Blocks palette, Libraries tab, then pick the DWG) or drag it from DesignCenter (ADCENTER). You can also download a single symbol on its own.

Count the symbols and build a parts list

Because ratings and part numbers are attributes, the symbols of a whole project can be counted and listed without opening the drawings. Export the blocks to Excel, total them with a pivot table and write corrections back in one run, with preview and backup.

See how to count blocks with BlockSync