Earth resistance calculator

Estimate the resistance to earth of ground rods, a buried strip or a grid, and see how many rods you need to reach the value you must meet.

Result

Earth resistance
31.78 Ω
Rods needed for the required resistance
10
  • Meets the required resistance 31.78 Ω≤4.00 Ω31{.}78\,\mathrm{\Omega } \le 4{.}00\,\mathrm{\Omega }Not met

Soil dries and freezes: design on the highest resistivity of the year, not the day you measured.

Working

  1. R1R_{1}(1)R1=ρ2πL×(ln⁡(4La)−1)=1002π×2.5×(ln⁡(4×2.50.0250)−1)=31.777 Ω\begin{aligned}R_{1} &= \frac{\rho }{2\pi L} \times \left(\ln \left(\frac{4L}{a}\right) - 1\right) \\ &= \frac{100}{2\pi \times 2{.}5} \times \left(\ln \left(\frac{4 \times 2{.}5}{0{.}0250}\right) - 1\right) \\ &= 31{.}777\,\mathrm{\Omega }\end{aligned}

Based on: IEEE Std 80 (rod); GB 50065 Appendix; Dwight / Sunde (mutual resistance)

How it is calculated

Single rod: R = ρ / (2πL) × (ln(4L/a) − 1), with L the length and a the radius. For several rods the mutual resistance of each pair is added, R_mn = ρ/(2πL) × (asinh(L/s) − √(1 + s²/L²) + s/L), and the group is solved with all rods at the same potential, so close rods are not counted as if independent.

Horizontal strip: the image method for a conductor at depth h. A strip is taken as a round conductor of half its width, as in GB 50065. Grid: R = ρ × (1/L_T + 1/√(20A) × (1 + 1/(1 + h√(20/A)))), the formula of IEEE 80; the quick estimate 0.5ρ/√A is also shown.

The soil is taken as uniform. Real soil is layered and changes with the season, so measure on site and design on the worst season.

Questions

How many ground rods do I need?
Enter the required resistance and the soil resistivity: the calculator adds rods until the value is met. Rods closer than their length help less than their number suggests, so spread them.
What earth resistance is required?
It depends on the system and the standard: commonly 4 Ω or less for a power system, 10 Ω for lightning protection, 1 Ω or less for substations. Check the rule that applies to your project.
How do I get the soil resistivity?
Measure it with the four-pin Wenner method on site. Tables give only a range: from about 10 Ω·m for wet clay to over 1000 Ω·m for dry rock.
Why does a deeper rod help more than more rods?
Resistance falls roughly with 1/L for one rod, but rods share the same patch of soil, so doubling the count gives much less than half. Going deeper reaches lower layers.